Western Star, BCRowland & White Star, NVEagle Point, NM

CSE: WSR · OTCQB: WSRIF · FRA: 4K2

Rediscovering North America's Forgotten Tungsten Powerhouse

Three past-producing tungsten properties in New Mexico and Nevada, with 27 holes planned.

01 / The gap

America needs tungsten.It mines none.

Tungsten alloys go into armor-piercing projectiles, and tungsten carbide tools cut, drill and mine for industry. The United States has not mined it commercially since 2015, and from January 1, 2027, U.S. defense contracts restrict tungsten mined or produced in China, Russia, North Korea and Iran.

Sources: U.S. Geological Survey, Mineral Commodity Summaries 2026; DFARS 252.225-7052.

From January 1, 2027

Pentagon ban

U.S. defense acquisition rules bar tungsten mined or produced in China, Russia, North Korea or Iran from Pentagon supply chains, subject to limited exceptions.

Source: DFARS 225.7018 and 252.225-7052
World tungsten mine production, 2025 (metric tons, tungsten content)
China67,000
Vietnam3,000
Kazakhstan2,400
Other countries2,400
Russia2,000
North Korea2,000
Bolivia1,700
Rwanda1,300
Australia1,000
Austria840
Spain800
Portugal700
United States0 t

Source: U.S. Geological Survey, Mineral Commodity Summaries 2026.

Economic importance of critical raw materials European Commission 2023 criticality assessment, score out of 10
Tungsten8.7
Magnesium7.4
Platinum group metals7.1
Manganese6.9
Cobalt6.8
Niobium6.5
Light rare earths5.9
Antimony5.4
Copper4.0
Gold2.4

Tungsten scored 8.7 for economic importance, the highest of the 87 raw materials assessed.

Source: European Commission, Study on the Critical Raw Materials for the EU 2023, Final Report.

In fiscal 2025 the U.S. National Defense Stockpile listed potential acquisitions of 2,041 t of tungsten, and tungsten projects in Nevada, New Brunswick and Yukon received Defense Production Act Title III awards. Source: U.S. Geological Survey, Mineral Commodity Summaries 2026.

02 / The strategy

Acquire the ground America already mined. Explore it with modern tools.

  1. 01

    Past producers

    Historical tungsten production was reported at all three U.S. properties between 1943 and 1956.

  2. 02

    Federal history

    In 1955 the U.S. Government signed a contract to fund 75% of shaft sinking and diamond drilling at Eagle Point. It was never carried out.

  3. 03

    Built to permit

    All seven planned Nevada drill pads sit on existing disturbance. Eagle Point has a surface use agreement and a filed BLM Notice.

  4. 04

    Modern methods

    LiDAR, drone magnetics on all three projects, 3D inversion in Nevada, a Leapfrog model at Eagle Point and ALS-certified assays, with Dahrouge Geological Consulting and KC Harvey Environmental.

1950s government sketch of the Eagle Point prospect showing limestone, granite and alluvium, the open cut, a prospect pit and tactite bodiesThen
Government sketch of the Eagle Point prospect, its open cut and tactite bodies (DMEA docket 1476X, 1950s). Source: company news release, June 15, 2026.
3D terrain model of the Rowland property with 2026 drone magnetic survey flight lines, the property boundary and historical workings in yellowNow
2026 drone magnetic survey lines over Rowland's historical workings (yellow). Source: company news release, May 21, 2026.

Sources: Company news releases of January 15, May 19, May 21, June 15, September 22 and October 7, 2026.

03 / The assets

Three U.S. past producers, one B.C. property.

Rock-cut entrance to historical workings at Eagle Point
Rock-cut entrance to historical workings at Eagle Point

Hidalgo County, New Mexico · 100% owned

Eagle Point Tungsten Project

A past-producing scheelite skarn the U.S. Government planned to drill in 1955.

  • 17 holes / ~6,070 ft planned
  • 0.11% WO₃ over 13.1 ft
Explore
Historical open pit at the Rowland Tungsten Property, Nevada
Historical open pit at the Rowland Tungsten Property, Nevada

Elko County, Nevada

Nevada Tungsten District (Rowland and White Star)

Two past-producing properties covering more than six kilometres of prospective tungsten-bearing horizons (Company exploration concept).

Rowland: Over 1,000 tons of ore up to 3.38% WO₃ reported 1943-1956.

White Star: About 10,000 tons at about 1.0% WO₃ reported in 1954.

  • 10 holes / ~5,000 ft planned
  • 4.02% WO₃ peak rock-chip (selective)
Explore
Rocky ridge at the Western Star Project, Revelstoke Mining District, British Columbia
Rocky ridge at the Western Star Project, Revelstoke Mining District, British Columbia

Revelstoke, British Columbia · 100% owned

The Western Star Project

The Company's founding carbonate-replacement silver-lead-zinc property.

  • 4,739.8 ha
  • Drill-permitted
Explore

Historical production figures and estimates pre-date modern reporting standards, have not been verified by a Qualified Person and are not current mineral resources or reserves. Rock-chip and grab samples are selective and may not be representative. No mineral resource has been established on any of the Company's properties.

Eagle Point, New Mexico

Drilling where the U.S. Government planned to in 1955

  1. 1943-44

    About 650 to 665 short tons grading about 0.44% WO₃ mined from an open cut and shipped (Faick and MacKallor, 1951; Dale and McKinney, 1959).

  2. 1955

    The U.S. Government signed a Defense Minerals Exploration Administration contract (Idm-E-783, Docket DMEA-3701) to fund 75% of shaft sinking and diamond drilling. It was never carried out.

  3. 2026

    Western Star acquires the project (June 15), maps scheelite-bearing skarn along about 2,600 feet of contact, reports first modern assays (October 7), submits an Exploration Notice to the BLM (October 22) and maps the skarn contact beneath cover with drone magnetics (November 11).

The historical production figures and the 1954 estimate pre-date modern reporting standards, have not been verified by a Qualified Person and are not current mineral resources or reserves. The Company is not treating them as current and provides them for historical context only. Sources: company news releases of June 15, August 12 and October 7, 2026.

Explore Eagle Point

04 / The evidence

What 2026 fieldwork has shown.

  • Jul 28, 2026 · Rowland

    Rock-chip up to 4.02% WO₃ (RO-16-01)

    Selective sample · Release

  • Jul 28, 2026 · White Star

    Rock sample 3.00% WO₃ (WS-16-02)

    Selective sample · Release

  • Aug 26, 2026 · Rowland and White Star

    3D magnetic inversion models buried intrusive bodies

    Geophysics · Release

  • Sep 18, 2026 · Rowland

    Soil peak 4,240 ppm W (0.53% WO₃), two anomalies

    Soil geochemistry · Release

  • Oct 1, 2026 · White Star

    Soil peak 2,230 ppm W (0.28% WO₃), two anomalies; 568 soils and four anomalies across Nevada

    Soil geochemistry · Release

  • Oct 7, 2026 · Eagle Point

    Channel CH1 0.11% WO₃ over 13.1 ft; grabs up to 0.55% WO₃; skarn mapped along about 2,600 ft

    Channel and grab samples · Release

  • Nov 11, 2026 · Eagle Point

    Drone magnetics trace the skarn-hosting granite-limestone contact for about 3 km, north-west beneath cover

    Geophysics · Release

Rock-chip, grab and soil samples are selective and may not be representative of mineralization. Eagle Point assays (October 7, 2026) reviewed and approved by Jacob Anderson, CPG, MAusIMM (independent QP); Eagle Point magnetics (November 11, 2026) and Nevada by Jasper Mowatt, MIMMM, MAusIMM (QP, not independent). No mineral resource has been established.

Eagle Point August 2026 samples on satellite imagery
Eagle Point: August 2026 samples on satellite imagery. Source: company news release, October 7, 2026.
Scheelite fluorescing under UV, Eagle Point, 2026
Scheelite fluorescing under UV, Eagle Point, 2026. No grade is inferred from visual or UV observation.

Scheelite, the main tungsten ore mineral, fluoresces bright blue-white under shortwave ultraviolet light, which is how geologists spot it in the field. Fluorescence is consistent with scheelite; no grade is inferred from visual or UV observation.

05 / What's next

27 holes, three properties.

  1. Nov 11, 2026 · done

    Eagle Point drone magnetics map the skarn-hosting contact beneath cover; the 17 planned holes sit on it, six stepping out up to about 400 m north-west of the historical workings.

  2. Oct 22, 2026 · done

    Eagle Point: Exploration Notice submitted to the BLM Las Cruces District Office; drill contract tendered.

  3. Next

    Eagle Point: 17-hole, approx. 6,070 ft program, the first drilling at Eagle Point in more than 70 years, subject to BLM review and state permits.

  4. Planned

    Nevada: 6 holes at Rowland and 4 at White Star, approx. 5,000 ft in total; drill permitting under way through a U.S. Forest Service Plan of Operations.

  5. Nov 25, 2026

    Annual General Meeting, Vancouver.

Rowland planned drill holes, October 13, 2026Source: company news release, October 13, 2026
White Star planned drill holes, October 20, 2026Source: company news release, October 20, 2026

06 / The company

A tight team with skin in the game.

  • Blake Morgan

    President, CEO and Director

  • Monty Sutton

    CFO and Director

  • Dallas Miller

    Director

  • Owen King

    Director

  • Garland Scott

    Director

61,395,716 shares issued and outstanding

As of October 9, 2026

CSE: WSR · OTCQB: WSRIF · FRA: 4K2

07 / Follow the story

Follow the story.

Subscribe for Updates

Receive Western Star Resources news releases and company updates.